search
  • 1998 Bohler BPI222

    No price - Munich, Germany
    • Manufacturer: Bohler

    construction year: 1998 hour meter: 15340 hr machine is in running condition. no leakages or major damages. fresh painting undercarriage on avg 90% life remaining 8 drilling rods of 6m, 109 mm atla...

  • 1992 Böhler Blocbo 2

    No price - Vienna, Austria Recently Added
    • Manufacturer: Böhler

    line drilling rig attachment for excavator2 feedshydraulic drifterdrilling depth 2400 mmdrilling diameter 32 - 48 mmremote controldust exhaust

  • 1998 Böhler Drillbo

    No price - Vienna, Austria Recently Added
    • Manufacturer: Böhler

    böhler drillbo 111 on mercedes unimog dth drill rig with magazine and dust exhaust year 1998 hours 1800 diesel engine hatz , 37 kw drilling diameter: 89 - 110 mm drill pipe magazine with 6 pipes á ...

  • 1986 BOHLER DTC122H

    No price - Santiago, Chile
    • Manufacturer: BOHLER
  • 1998 Böhler TC118 #ID0913

    No price - Metten, Germany
    • Manufacturer: Böhler

    13 t

  • 1999 BOHLER BPI 119 drilling rig

    $28,069 - Lemgo, Germany
    • Manufacturer: BOHLER
    • Hours: 10112 m/h

    power: 176 kilowatts ce 1 stem hammer base hole machine in good condition

  • 1984 BOHLER DTC 111 drilling rig

    $21,184 - Girona, Spain
      • Hours: 4281 m/h

      digging depth - 100 m. digging depth: 100 m | running hours: 4281 m/h | vehicle condition: good | first registration: 1984

    • 1998 Atlas Copco Bohler BPI 222 drill 00022720

      $41,281 - Velddriel, Netherlands
      • Manufacturer: Atlas-Copco

      used 1998 atlas copco bohler bpi 222 drill driller (00022720) for sale at big machinery.

    • 1990 Komatsu PC150

      No price - Munich, Germany
      • Manufacturer: Komatsu
      • Model: PC150

      construction year: 1990 hour meter: hr undercarriage on avg 60% life remaining böhler tc111 drilling mount 95mm immloch drill 40m drill rods 600mm pads not ce marked not epa marked used hydraulic ...

    • Böhler

      $31,221 - Rumelange, Luxembourg

        bohler tcd 222 1992 2 deutz engines, 5 x 6 meters piling rigs orientation: verticale année de construction: 1992 nombre d'heures: 20000heures