• 2009 SALTEC Torgar 1-2500

    $15,832 - Baden-Württemberg, Germany
    • Manufacturer: SALTEC

    personnel and material elevator torgar t1-25 lift value: 2500 kg / to 28 persons speed: 30m / min 7dlzp9n38 motor: 3 x 11 kw / 400 v dimensions: cage: 1, 5m x 3, 8m x 2, 2m mounting surface: 2, 7 m...

  • 2010 SALTEC TORGAR T1-2500

    $15,818 - Baden-Württemberg, Germany Recently Added
    • Manufacturer: SALTEC

    personnel and material elevator torgar t1-25 lift value: 2500 kg / to 28 persons mvgur speed: 30m / min motor: 3 x 11 kw / 400 v dimensions: cage: 1, 5 x 3, 8mx2, 2m mounting surface: 2.7 x 4.0 m m...

  • 2009 SALTEC TORGAR T1-25

    $16,596
    • Manufacturer: SALTEC

    personnel and material elevator torgar t1-25 lift value: 2500 kg / to 28 persons speed: 30m / min motor: 3 x 11 kw / 400 v dimensions: cage: 1, 5m x 3, 8m x 2, 2m mounting surface: 2, 7 m x 4.0 m j...

  • 2005 Camac 2000

    No price - Spain
    • Manufacturer: Camac

    electric motorized scaffold, with platforms and galvanized mast. two-phase or monomass configuration - rack sprocket system configuration bi-mast - length up to 25,44 m. . possible height 120 m...

  • 2005 Camac 2000

    No price - Spain
    • Manufacturer: Camac

    electric motorized scaffold, with mast and galvanized mast. two-phase or monomass configuration - rack sprocket system configuration bi-mast - length up to 25,44 m. possible height 120 m. confi...

  • 2005 Camac 3000

    No price - Spain
    • Manufacturer: Camac

    electric motorized scaffold, with mast and galvanized mast. two-phase or monomass configuration - rack sprocket system configuration bi-mast - length up to 32.54 m. (3420 kg maximum lifting capa...

  • 2003 Alba PEC 120

    No price - Madrid, Spain
    • Manufacturer: Alba

    electric motorized scaffold, with mast and galvanized mast. two-phase or monomass configuration - rack sprocket system configuration bi mast - length up to 30,27 m. (3700 kg maximum lifting capa...