State

  • 2009 Putzmeister SIKA PM 407PD

    • Manufacturer: Putzmeister
    • Hours: 3042 h

    description: pm407 pd concrete launcher -brand putzmeister -year 2009 -stand -3042 hours it is particularly suitable for mines, tunnels and small wells. it is built in a vehicle with rubber tires with the...

    No price
    Ciudad de México, Mexico
  • 2004 Putzmeister BSA2109HE

    • Manufacturer: Putzmeister
    • Hours: 1165 h

    description: putzmeister bsa 2109 he output up to 85 m3/h, delivery press max bar: 91 putzmeister bsa-2109he electric concrete pump. output up to 85 m3/h, delivery press max bar: 91 meter reading: 1165 hours.

    No price
    Atlanta, GA, USA

Have 5 seconds to help us improve the results?

I'll do it
No thanks