Conow HW 80 V4.2.1
new
- Manufacturer: Conow
- Tipping bridge with combined superstructure suitable for transporting chaff and grain - body 120 cm high with 40 cm extension - tiltable to the left (on request also tiltable to the right) - profiled laser-weld...
Feldberger Seenlandschaft, GermanyConow HW 80 V4.2
new
- Manufacturer: Conow
- Tipping bridge with combined superstructure 120 cm high - tiltable to the left (on request also tiltable to the right) - front, rear and one side wall are continuous drop sides and firmly welded to the tipping ...
Feldberger Seenlandschaft, GermanyConow tipper bridge with body 95 / 90 cm high
new
- Manufacturer: Conow
- left side tiltable (on request tiltable to the right side) - left sides with longitudinally divided profiled laser-welded drop sides, - left side is equipped with upper pendulum drop side and lower drop side - ...
Feldberger Seenlandschaft, GermanyConow tipper bridge with combined body 95 / 90 cm high
new
- Manufacturer: Conow
- left side tiltable (on request tiltable to the right side) - right side with continuous side wall firmly welded - the left side with two longitudinally divided drop sides reinforced by 3 vertical - by 3 vertica...
Feldberger Seenlandschaft, GermanyConow HW 60 V1 standard version
new
- Manufacturer: Conow
This design is the conventional superstructure as we have known it for years with the trailers HW 80 and HW 60. This body is characterized by its versatility, whether for loading grain to transporting manure or b...
Feldberger Seenlandschaft, GermanyConow HW 80 V9 / V9.1
new
- Manufacturer: Conow
The multi-purpose body variant 9 is a universally applicable body. Due to its extraordinarily stable design and good sealing, all transport goods, from silage/chaff, wood chips, manure to grain, can be transporte...
Feldberger Seenlandschaft, GermanyConow - Tipping bridge with wide wall 95 cm high
new
- Manufacturer: Conow
- tiltable on one side, without center stanchion - Tilting bridge on the tilting side with reinforced outer frame profile 6 mm, - front and rear walls are firmly welded to the tipping bridge, - one side: continuo...
Feldberger Seenlandschaft, Germany